Wednesday, August 3, 2011

Job in Progress: Build Log 2

 Week 2 of the build log:  DEMOLITION

We deconstruct the original room down to the "bare bones".


Another surprise--we found some non-functional plumbing behind the wall where the sink had been.


The next step is installing the "behind the scenes" electrical and plumbing requirements and fixing any "curiosities" found during demolition.


This is also the time to do little things that will make a big difference in the long run.
For example, before new flooring is installed, we check the sub-floor and nail down loose pieces to prevent squeaky floors.

We will now call for framing, plumbing, and electrical inspections. Once we are signed off we're on our way to sheetrock and cabinets!